Technical article · Company News

Seachios® Wins a Second Consecutive VLI Ship Loader Cleaning Contract at Itaqui

A second consecutive ship loader cleaning contract from VLI at the Port of Itaqui: berth 105 cleaned by high-pressure hydroblasting, with EMAP approval.

Published
Reading time
3 min
Author
Seachios® Media & Press Team · Corporate Communications
Share
Shiploader at the pier
On this page04
  1. 01A second ship loader cleaning contract, won on merit
  2. 02Working with the port authority
  3. 03How the loader is cleaned
  4. 04Standards we answer to

For the second time in a row, Seachios® Marine Services has won the ship loader cleaning contract at the Port of Itaqui from VLI Logística, through a competitive bidding process. VLI, created by Vale S.A. to run integrated rail, terminal and port operations across Brazil, has entrusted us again with the cleaning of the ship loader at berth 105, a renewal that speaks for the work done the first time.

The contract at a glance

Client
VLI Logística
Asset
Ship loader, berth 105
Port
Port of Itaqui, São Luís, Maranhão
Port authority
EMAP
Award
Competitive bidding, second consecutive time
Works
From 22 January 2025, completion expected 6 February 2025

A second ship loader cleaning contract, won on merit

A repeat award through competitive bidding is not a formality. The client measured the first job against its own requirements, opened the work to the market again, and chose the same team. For a port operator, the measures are clear: the loader back in service on time, no damage to its systems, no residue left on the berth or in the water, and paperwork the port authority accepts without questions.

Working with the port authority

Before any work began, our commercial team met EMAP, the authority that runs the Port of Itaqui, to present the plan. The meeting stressed two priorities that guide every job on the berth: keeping the ship loader in condition so the terminal runs efficiently, and protecting the environment around it.

From award to the berthStage 04 of 04
  1. Award

    Contract won

    Second consecutive award by VLI Logística, through competitive bidding.
  2. Before the works

    Port authority

    The plan presented to EMAP, evaluated and approved.
  3. 22 Jan 2025

    Works begin

    Cleaning of the ship loader at berth 105 starts.
  4. 6 Feb 2025

    Completion expected

    The scheduled end of the works.

How the loader is cleaned

The method combines high-pressure hydroblasting, which removes the debris and contaminants built up on the structure, with the controlled extraction and disposal of everything that comes off it, liquid and solid.

  1. 01Prepare
    The plan approved by the port authority and the work area made safe before any water is used.
  2. 02Hydroblast
    High-pressure water strips the accumulated debris and contaminants from the structure.
  3. 03Extract
    Liquid and solid residues collected as they come off, never left to run.
  4. 04Dispose
    Residues taken away and disposed of safely, by the rules.
Night wash from the quayThe shiploader's portal and tower washed from the quay at night, jets arching up into the structure.

Standards we answer to

Seachios® Marine Services works to the highest standards of quality, safety and environmental compliance, in line with Brazil's federal regulations and accredited by EMAP to work in the Port of Itaqui. Those same standards apply on the ships we serve, from cargo hold cleaning to tank cleaning.

A ship loader cleaning contract renewed after competitive bidding is the best reference a port team can earn. We will keep publishing what we do at Itaqui and on the rest of the coast.

MA · NortheastItaquiAlumar · Ponta da MadeiraPort page →

Sources

  1. VLI LogísticaVLI
  2. National Waterway Transportation Agency (ANTAQ)Government of Brazil

Cite this entry

Reference

Seachios® Media & Press Team. Seachios® Wins a Second Consecutive VLI Ship Loader Cleaning Contract at Itaqui. Seachios®, SC-RPT-01, February 5, 2025. https://www.seachiosbrazil.com/press/seachios-secures-second-consecutive-contract-with-vli-logistica-for-ship-loader-cleaning-at-port-of-itaqui

BibTeX
@misc{seachios:sc-rpt-01,
  author = {{Seachios® Media & Press Team}},
  title = {Seachios® Wins a Second Consecutive VLI Ship Loader Cleaning Contract at Itaqui},
  year = {2025},
  month = feb,
  howpublished = {Seachios®, SC-RPT-01},
  url = {https://www.seachiosbrazil.com/press/seachios-secures-second-consecutive-contract-with-vli-logistica-for-ship-loader-cleaning-at-port-of-itaqui}
}
SC-REQ-01Request for serviceOperations online · Santos --:--:-- BRT

ContactOperations hub · 24/7

Plan your next job in Brazil. Our operations hub replies 24/7.

Send the vessel, the port and the dates. We reply with a plan, a team and a timetable.

Response
30–60 min
Ports
12 · 04 Regions
Operations hub
Santos · 24/7

What to send

  1. 01The vessel and its IMO number
  2. 02The port, the berth or anchorage, and the dates
  3. 03The service, and what the work involves
  4. 04A plan from one of our tools, if you made one