The access channel to Santos is divided into five stretches, from the bar to beyond the Alamoa terminal. The Port Authority (APS) sets a maximum operating draft for each: 13.50 m at low water and 14.50 m at high water from the bar to Alamoa, 13.20 m and 14.20 m beyond it.
- 14.20 / 14.50 m
- Max draft
- 0.82 m
- Mean tide range
- 23°57′S 046°20′W
- Position
- Nov 18, 2026
- Last checked
01/Port profile
Santos in figures.
A berth draft is capped at the draft of the channel stretch it lies on. The table on this page is APS revision 271 of 30 April 2026, berth by berth, with the length and design depth the Port Authority publishes.
The Seachios® operations hub is in Santos. Hold and tank cleaning, underwater work, anchor and chain work, repairs afloat and agency along the coast are coordinated from here.
Port particulars
- Region
- Southeast · SP
- Position
- 23°57′S 046°20′W
- Tide gauge
- Porto de Santos · 2.3 km
- Last checked
- Nov 18, 2026
- Sources
- 02
Operations hub
02/Access
Channel and berth limits.
The channel and berth limits in force, each numbered to the document that sets it. Drafts are given in metres over chart datum.
- Channel draft, low and high water
- 13.50 / 14.50 m[1]
- Bar to the Alamoa terminal (stretches I to IV)
- Inner channel draft, low and high water
- 13.20 / 14.20 m[1]
- Alamoa terminal to the end of stretch IV
- Deepest berth draft, low and high water
- 14.20 / 14.50 m[1]
- BTP, Tecon, TEV, ARM 15 to 19 and Outeirinhos 02
- Longest berth
- 400 m[1]
- BTP 03
- Berths
- 50[1]
- Berths in the Port Authority table
- Air draft
- 67.5 m[1]
- Above chart datum, from Outeirinhos 3 upstream
- 01Drafts are referred to chart datum (zero DHN).[1]
- 02The high-water drafts apply to any high tide of 1.00 m or more.[1]
- 03A berth draft never exceeds the operating draft of the channel stretch the berth lies on.[1]
- 04Solid-bulk berths whose seabed study the Capitania dos Portos de São Paulo cleared publish their drafts under the NAABSA clause.[1]
- 05In ballast, the minimum forward draft rises with deadweight, from 2.5 m for ships up to 10,000 dwt to 7.5 m above 200,000 dwt, with the propeller at least 90 % immersed.[1]
03/Berths
The berth table. Low- and high-water drafts.
One line per berth, grouped by stretch of channel: its length, its design depth where the table states one, and the deepest draft allowed at low water and at high water, all in metres.
How many berths take each draft
- 10 m46 / 50
- 11 m40 / 50
- 12 m31 / 50
- 13 m25 / 50
- 14 m14 / 50
- 15 m0 / 50
Counted at low water.
| Trecho IV-b | ||||
|---|---|---|---|---|
| AL 01 | 307 | 12.70 | 12.40 | 12.70 |
| AL 02 | 307 | 12.70 | 12.40 | 12.70 |
| AL 03 | 272 | 12.70 | 12.40 | 12.70 |
| AL 04 | 272 | 11.70 | 11.40 | 11.70 |
| Trecho IV | ||||
| BTP 01 | 354 | 15.00 | 14.20 | 14.50 |
| BTP 02 | 354 | 15.00 | 14.20 | 14.50 |
| BTP 03 | 400 | 15.00 | 14.20 | 14.50 |
| IB OE | 230 | 15.00 | 12.80 | 13.10 |
| AGEO 01 | 230 | 15.00 | 11.90 | 12.20 |
| IB SP | 215 | 10.30 | 10.00 | 10.30 |
| IB BC | 215 | 10.30 | 10.00 | 10.30 |
| CS 01 | 184 | 10.70 | 10.40 | 10.70 |
| CS 02 | 200 | 10.70 | 10.40 | 10.70 |
| CS 03 | 202 | 10.70 | 10.40 | 10.70 |
| CS 04 | 184 | 13.20 | 11.90 | 12.20 |
| CORTE | 197 | 11.70 | 10.30 | 10.60 |
| VALONGO | 320 | 15.00 | 13.40 | 13.70 |
| Trecho III | ||||
| ARM 12 | 220 | 13.00 | — | — |
| ARM 12-A | 215 | 14.60 | — | — |
| ARM 13/14 | 216 | 11.30 | 13.80 | 14.10 |
| ARM 15 | 198 | 11.30 | 14.20 | 14.50 |
| ARM 16/17 | 267 | 13.50 | 14.20 | 14.50 |
| ARM 19 | 270 | 13.00 | 14.20 | 14.50 |
| ARM 20/21 | 251 | 13.00 | 12.90 | 13.90 |
| ARM 22/23 | 256 | 15.00 | 14.00 | 14.30 |
| CURVA 23 | 172 | 8.30 | 7.20 | 7.50 |
| ARM 25 | 305 | 8.30 | 8.60 | 8.90 |
| Trecho II | ||||
| OUTEIRINHOS 03 | 305 | 15.00 | 13.50 | 14.50 |
| OUTEIRINHOS 02 | 210 | 15.00 | 14.20 | 14.50 |
| OUTEIRINHOS 01 | 210 | 15.00 | 14.00 | 14.30 |
| ARM 29 | 229 | 11.70 | 11.40 | 11.70 |
| ARM 30 | 225 | 11.70 | 11.40 | 11.70 |
| ARM 31 | 260 | 11.70 | 11.40 | 11.70 |
| ARM 32 | 248 | 11.70 | 11.40 | 11.70 |
| ARM 33 | 253 | 11.70 | 11.40 | 11.70 |
| ARM 34 | 263 | 11.70 | 11.40 | 11.70 |
| ARM 35.1 | 238 | 13.50 | 13.20 | 13.50 |
| ARM 35.2 | 260 | 13.50 | 13.20 | 13.50 |
| ARM 37 | 374 | 13.70 | 13.40 | 14.40 |
| ARM 38 | 319 | 13.70 | 13.50 | 14.50 |
| ARM 39 | 289 | 13.70 | 13.50 | 14.50 |
| TEAG | 174 | 13.00 | 12.80 | 13.80 |
| TEG | 168 | 13.00 | 13.00 | 14.00 |
| TERMAG | 277 | 14.20 | 13.90 | 14.20 |
| TGG | 277 | 14.20 | 13.40 | 14.40 |
| TECON 3 | 366 | 15.00 | 14.20 | 14.50 |
| TECON 2 | 367 | 15.00 | 14.20 | 14.50 |
| TECON 1.2 | 245 | 16.00 | 14.20 | 14.50 |
| TECON 1.1 | 220 | 16.00 | 14.20 | 14.50 |
| TEV | 310 | 16.00 | 14.20 | 14.50 |
Source [1] · The check reads the table’s drafts and nothing else. Keel clearance, trim and the height of tide at berthing are settled with our team and the pilots before the call.
04/Tides
Tide levels on the staff.
Computed from the 2026 tide tables of the Brazilian Navy (DHN) for Porto de Santos, a station 2.3 km from the port. Every height is in metres over chart datum.
- Mean range
- 0.82 m[2]
- Mean high water
- 1.18 m[2]
- Mean sea level
- 0.78 m[2]
- Mean low water
- 0.36 m[2]
- Highest predicted
- 1.51 m[2]
- Lowest predicted
- -0.13 m[2]
The means are taken over all 1,461 tides predicted for 2026 at Porto de Santos; the extremes are the highest and lowest of them. Harmonic constituents: 24; nautical chart 1711.
05/Services
Our services at this port.
Whatever the port, our operations hub in Santos runs the call: one set of procedures, one way of documenting the work.
Field notesOperations hub · 24/7
Local know-how for this port — where ships wait at anchor, where the pilot boards, which berths tend to slip and what each terminal asks of a ship — is being written up. Until it is here, talk to us before fixing the plan.
In preparation
- Climate
- Climate normals 1991–2020 (INMET)
- SVC-01Cargo holdsSantosCargo Hold CleaningBulk carrier holds cleaned to grain or hospital standard in Brazilian ports, with robotic hydroblasting and no cure, no pay terms.180,000+cargo holds cleaned since 198095%less laycan downtime5 holds / 36 hwith robotic unitsAbout Cargo Hold Cleaning
- SVC-02Fuel tanksSantosTank CleaningFuel, slop and settling tanks cleaned and gas-freed in Brazilian ports, documented under MARPOL Annex I for safe fuel changeovers.4–7%lower fuel consumption≈15%lower maintenance costIMO 2020sulphur-limit readyAbout Tank Cleaning
- SVC-03Below the waterlineSantosUnderwater ServicesHull cleaning, propeller polishing, sea chest work and inspection support by commercial divers, with HD video, in Brazilian ports.24/7operational response4Kphoto and video records30+Brazilian service pointsAbout Underwater Services
- SVC-04Anchor and cableSantosAnchor and Chain ServicesAnchors and chain cables gauged, tested, repaired, supplied and recovered in Brazilian ports, to IACS class requirements.IACSclass-member standardsNDTMT, UT and dye penetrant24/7anchor recoveryAbout Anchor and Chain Services
- SVC-05Repairs afloatSantosGeneral Ship RepairRepairs afloat in Brazilian ports: cranes, hold steel, welding, leaks, thickness gauging and emergency work by riding squads.24/7riding squadsUTclass-accepted thickness gaugingAfloatno drydock delayAbout General Ship Repair
- SVC-06At the berthSantosShipping AgencyPort agency in Brazil for owners and charterers: pre-arrival to final DA, husbandry, crew changes and protective agency.PDA → DAone accountable agentOPAowners’ interests protected24/7port call coordinationAbout Shipping Agency
Tools for the call02
- T-03Statement · PDF · QR codeToolLaytime & demurrage calculatorCharter party terms and port call times turned into laytime, demurrage or despatchOpen instruments, no sign-up
- T-01Plan · PDF · QR codeToolHold cleaning plannerWhat a cargo change requires: standard, days, inspection risk and methodOpen instruments, no sign-up
06/Terms
The words on this page.
- Chart datum
- The level the Navy’s charts and tide tables are measured from, set near the lowest tides: depths are counted below it, tide heights above it.
- Draft
- How deep a ship floats, from the waterline down to the bottom of her keel. A port’s maximum draft is the deepest a ship may float to enter, lie alongside or sail.
- Under-keel clearance
- The water left between the keel and the seabed. Pilots and the port authority set the least a ship must keep, passage by passage and berth by berth.
- Mean tide range
- The average rise from low water to high water over all the tides predicted for the year.
- Air draft
- The height from the waterline to the ship’s highest point, which bridges and overhead cables limit.
07/Questions
What planners ask about Santos.
How deep a draft can Santos take?
Deepest berth draft, low and high water: 14.20 / 14.50 m (BTP, Tecon, TEV, ARM 15 to 19 and Outeirinhos 02). Source: Autoridade Portuária de Santos (APS), Calados Operacionais dos Berços de Atracação.
How big is the tide at Santos?
The average range is 0.82 m, from a mean high water of 1.18 m to a mean low water of 0.36 m above chart datum, across the 1,461 high and low waters the Navy forecasts for 2026 at Porto de Santos. Mean sea level is 0.78 m above chart datum.
What can Seachios do for a ship at Santos?
Cargo Hold Cleaning · Tank Cleaning · Underwater Services · Anchor and Chain Services · General Ship Repair · Shipping Agency, coordinated by our operations hub in Santos, open 24/7.
08/Sources
The documents behind the figures.
- [1]Autoridade Portuária de Santos (APS). Calados Operacionais dos Berços de Atracação. Revisão nº 271, 30 Apr 2026. Read Nov 18, 2026.
- [2]Marinha do Brasil, Centro de Hidrografia da Marinha (DHN). Tábuas das Marés 2026: Porto de Santos (Estado de São Paulo). 24 componentes, nível médio 0.78 m, carta 1711. Read Nov 18, 2026.
Port information sheet
Everything on this page on one drawing sheet: the limits and their rules, the berths, the tide, the climate, the services, the questions and the sources.
The data as CSV
Contact/Operations hub · 24/7
Plan your next job in Brazil. Our operations hub replies 24/7.
Send the vessel, the port and the dates. We reply with a plan, a team and a timetable.
- Response
- 30–60 min
- Ports
- 12 · 04 Regions
- Operations hub
- Santos · 24/7
What to send
- 01The vessel and its IMO number
- 02The port, the berth or anchorage, and the dates
- 03The service, and what the work involves
- 04A plan from one of our tools, if you made one