How long under the hull, and with whom?

Describe the hull, the zones and niche areas, the survey, the fouling found, the method and the water conditions. The planner works out the wetted surface by zone, the days and teams, the dive windows, the work sequence and the permits: a technical plan to share, save or send with your request.

Plan · PDF · QR code
Output
Denny–Mumford
Surface
NORMAM-401 · 0–4
Fouling
Operations hub, 24/7
Response

Plan an underwater hull job in port: the wetted surface by zone, the fouling level, divers or an ROV, the niche areas, the survey, the dive windows, the days and teams and the permits, with a PDF and a shareable link.

01

Hull & job

01Hull

A typical hull fills the figures; every one stays yours to edit

m
m
m
Location

02Scope

The zones to clean and the niche areas

m
4
3

03Survey

What is filmed, measured and reported

A CCTV sweep of the whole hull, as found

0

04Condition

The growth found, on the NORMAM-401 and IMO 0–4 scale

LightMacrofouling 1–15 % of the hull

9

05Method & water

Who works the hull, and what the water allows

Visibility
kn
1
Working hours
02

Hull zones

SC-UW-001
Profile · starboard side4M8M12M4M8M12M4M8M12MSDWL 13.0 mLBP 192.0 mT 13.0AP123456789FPPropeller Ø 6.4 m · 4Sea chests × 3ICCPBoot top0102050mView from belowCLFlat bottom · 5,203 m²PortStarboardB 32.26Docking plugsBilge keel and anodesMidship sectionCLB 32.26 mD 18.1T 13.0Double bottomZonem²m²/hTeam-hJobBoot top5308240.6●Vertical sides3,7131,0303.6●Flat bottom5,2031,0305.0●Σ9,4469.3SC-UW-001 · Hull zonesLBP 192.0 · B 32.26 · T 13.0 · Cb 0.84 · S 9,446 m²Seachios®

Point at a zone to read it; its legend takes it in or out of the job.

03

Wetted surface

DENNY–MUMFORD

9,446m²

S = 1.7 · L · T + Cb · L · B

To clean · 9,446 m²

04

Days & teams

AGW/WP

2.5days

30 team-hours · 9.2 h in the water a day

Teams
1 × 5
People
5
Rate
1,016 m²/h
Method
Divers

Planning rates, confirmed by our divers after the first dive.

05

Dive windows

9.2 H / day

An indicative semidiurnal current peaking at the speed you set; our team sets the actual windows from the port’s tide table.

06

Order of work

10 · D1–D3
07

Paperwork & deliverables

09

Before the first dive

  • Port authority permission for in-water work (NORMAM-401/DPC)
  • The agent’s notice to the port, fitted to the ship’s schedule
  • The ship’s isolation: propeller, rudder and thrusters locked, ICCP off, sea suctions shut
  • Signal flag A shown while divers are down
  • Debris captured, filtered and landed, with its disposal record

What you receive

  • Photo and video evidence set organised by area
  • Before-and-after records
  • Survey report with the findings by zone
  • Observations limited to what is visually confirmed
08

Why now

SCHULTZ 2007

Added shaft power at 15 kn for the fouling level, after Schultz (2007): indicative, the same for every hull.

Send the plan for a quotation

Times are estimates, all going well and weather permitting, and depend on the vessel’s availability.

A technical plan for an underwater job afloat, subject to the port’s permission and an official quotation.

02How to use

Four steps, a plan ready to share.

Results change as you type, and nothing is sent until you decide to send the plan.

  1. 01

    Give the hull

    Choose a typical hull or type its length, breadth, draft and block coefficient: the wetted surface and its zones follow.

    Go to the hull
  2. 02

    Set the scope and the survey

    The zones to clean, the propeller, the rudder, the sea chests and the thruster tunnel; then the survey and the thickness readings.

    Go to the scope
  3. 03

    Say what was found and what the water allows

    The fouling level, divers or an ROV, debris capture, the visibility, the current and the hours: the days and the windows follow.

    Go to the method
  4. 04

    Keep it, share it or attach it

    Days, teams, work sequence and permits change as you edit. Copy the link, scan the QR code, save the PDF or send the plan with your request.

    Go to the plan

03Method

How the plan is worked out.

Planning rates for one team, by fouling level: our divers confirm them after the first dive, and no price is calculated.

Square metres one team cleans in an hour, good visibility, without capture (× 0.8 with it).
Fouling levelDivers with brush cartsROV crawler
0 · Clean2,400 m²/h2,000 m²/h
1 · Slime2,000 m²/h1,800 m²/h
2 · Light1,400 m²/h1,200 m²/h
3 · Considerable900 m²/h700 m²/h
4 · Extensive500 m²/hDivers take it
Wetted surface
Denny–Mumford, S = 1.7·L·T + Cb·L·B: the flat bottom takes Cb·L·B, the sides the rest.
Boot top
The band 1.5 m under the waterline along both sides, where weed grows first: a fifth slower to clean.
Debris capture
A closed brush head and filtration, advised beyond slime: about a fifth slower.
Visibility
Divers lose a tenth of their rate in moderate water and a fifth in poor water; an ROV less.
Niche areas
Propeller polishing by diameter and blades; rudder, sea chests with their gratings and the thruster tunnel by the piece, more for calcareous growth.
Dive windows
Ten hours in the water on a day shift, eighteen and a half round the clock, read against the tidal stream: the full rate up to 0.7 kn, three quarters up to 1.5 kn, no diving above.

04FAQ

Questions we are asked most often.

01Does the plan include a price?

No. It is a technical plan of the area, the time, the teams, the work sequence and the permits. Our operations hub sends the formal quotation once you submit the plan; the planner never calculates a price.

02How is the wetted surface worked out?

With the Denny–Mumford formula, S = 1.7·L·T + Cb·L·B, from the length between perpendiculars, the draft during the work, the breadth and the block coefficient. The flat bottom takes the Cb·L·B part; the sides the rest, the boot top band the 1.5 m under the waterline.

03What do the fouling levels mean?

The 0–4 scale of NORMAM-401/DPC and the IMO guidelines: 0 clean, 1 slime, 2 light macrofouling on up to 15% of the hull, 3 considerable on 16–40%, 4 extensive beyond 40%. The level sets the rate a team cleans at.

04How many days does a hull cleaning in the water take?

Usually one to three days for a whole hull, the niche areas worked beside it. It never runs past four days — a ceiling rarely reached: when the figures say more, the plan puts more teams on the hull, or works round the clock.

05Divers or an ROV?

An ROV crawler covers the large flat areas fastest while the growth is soft; divers with brush carts and scrapers take the niche areas and heavy calcareous growth, which an ROV does not. The planner switches to divers on its own at level 4.

06Why does the current matter so much?

Divers work safely in weak currents. Above about 1.5 knots, dives are limited to slack water — a few short windows a day — and the job takes longer. Our team sets the actual windows from the port’s tide table.

07What is a UWILD?

An underwater inspection in lieu of dry-docking: the class surveyor attends while divers film the hull, the rudder, the propeller, the sea chests and their valves, and take the thickness readings the surveyor asks for. It needs the class notified and a diving firm the class approves.

08What permissions does the job need?

The port authority’s permission for in-water work (NORMAM-401/DPC), the terminal’s approval at a berth, and the ship’s systems isolated while divers are in the water. The planner lists them and our team files the requests.

09Is my data saved anywhere?

No. The data stays in your browser, and nothing is sent until you submit the plan through the contact page and add your details there.