Operations online · Santos --:--:-- BRTSC-PORT-003

Pecém CE · Brazil

Pecém is the port complex of São Gonçalo do Amarante, west of Fortaleza, in Ceará: an offshore terminal sheltered by a breakwater, with two piers and a multipurpose quay (TMUT). With no dredged channel, ships of up to 366 m approach straight from the sea.

Request a proposal

ShareLinkedInXWhatsAppMail

15.40 m
Max draft
1,584 mm
Annual rainfall
03°32′S 038°49′W
Position
Nov 18, 2026
Last checked

01Port profile

Pecém in figures.

The Capitania dos Portos do Ceará lists, for each of the ten berths, the static draft (with a 0.30 m under-keel clearance), the draft allowed without a tide window and the largest ship it takes. At the INMET station in Fortaleza, 43 km away, rain totals 1,584 mm a year; April is the wettest month and October the driest.

Port particulars

Region
Northeast · CE
Position
03°32′S 038°49′W
Weather station
Fortaleza · 43 km
Last checked
Nov 18, 2026
Sources
02
SC-PORT-003Locator
0°10°S20°S30°S50°W40°WOperations hubPecémN300 NM

By sea from Santos1,796 NM≈ 150 h at 12 kn

02Access

Channel and berth limits.

The channel and berth limits in force, each numbered to the document that sets it. Drafts are given in metres over chart datum.

Deepest berth draft
15.40 m[1]
Pier 2, berths 3 and 4: static draft with a 0.30 m under-keel clearance
Longest ship accepted
366 m[1]
TMUT berths 5, 9 and 10, beam up to 52 m
Berths
10[1]
Piers 1 and 2 and the multipurpose terminal (TMUT)
  1. 01Pecém has no dredged access channel: ships approach from the pilot boarding point to the turning basin between the piers, and the drafts assume no negative tide.[1]
  2. 02Tide needed to berth = the ship’s largest draft minus the draft allowed without a tide window; a negative tide lowers the recommended draft by as much.[1]
  3. 03On the TMUT the under-keel clearance falls to 0.24 m between bollards 25 and 26, and depths of 14.84 m are found between bollards 52 and 56.[1]
  4. 04LNG carriers at berths 3 and 4 should berth by day; manoeuvres are recommended with wind up to 24 knots.[1]
  5. 05Speed limit 7 knots; crossing and overtaking are not recommended in manoeuvring areas 1 and 2.[1]
  6. 06Between two ships on the TMUT, the gap depends on the larger LOA: 30 m below 200 m, 37.5 m up to 250 m, 45 m up to 300 m and 15 % of the LOA above 300 m.[1]
  7. 07The table rests on the port company’s study DIENG 184-2020 (CIPP S.A.), with dynamic and static drafts and under-keel clearances for the design ships.[1]

03Berths

The berth table. The largest ship each berth takes.

As the Harbour Master’s rules list them, terminal by terminal: length overall, beam and draft in metres, without and with the tide.

How many berths take each draft

  1. 10 m10 / 10
  2. 11 m10 / 10
  3. 12 m10 / 10
  4. 13 m9 / 10
  5. 14 m0 / 10
  6. 15 m0 / 10

Counted without the tide.

m

Píer 1
Berço 1 (cabeços 01–16)280.038.012.1114.00
Berço 2 (cabeços 00–16)300.047.013.2014.70
Píer 2
Berço 3 (cabeços 01–10)290.046.013.3215.40
Berço 4 (cabeços 01–10)310.052.013.3215.40
TMUT, Terminal de Múltiplo Uso
Berço 5 (cabeços 00–11)366.049.013.2015.30
Berço 6 (cabeços 11–20)280.038.013.2015.30
Berço 7 (cabeços 20–28)300.047.013.2015.30
Berço 8 (cabeços 28–35)290.046.013.2015.30
Berço 9 (cabeços 35–45)366.052.013.2015.30
Berço 10 (cabeços 45–56)366.052.013.2015.30

Source [1] · The check reads the table’s drafts and nothing else. Keel clearance, trim and the height of tide at berthing are settled with our team and the pilots before the call.

04Climate

Rain and heat through the year.

Long-term monthly averages (1991–2020) recorded by INMET at Fortaleza, a station 43 km from the port.

1,584 mmrain in a year
385 mmApril, the wettest month
10 mmOctober, the driest month
010020030040020°24°27°31°34°mm°CJanFebMarAprMayJunJulAugSepOctNovDec
RainMaxMin
MonthRain, mmRain daysMax, °CMin, °C
Jan156.413.031.224.5
Feb187.014.031.124.3
Mar336.920.330.823.9
Apr385.021.030.623.8
May229.015.930.823.8
Jun130.010.030.523.2
Jul69.76.630.622.8
Aug20.0—31.122.9
Sep13.62.631.423.6
Oct9.52.631.624.3
Nov9.82.731.724.7
Dec37.15.431.724.9
Year1,584.0—

Source [2] · Days with rain count those with 1 mm or more. Where the normals hold no figure for a month, the table shows a dash.

05Services

Our services at this port.

Whatever the port, our operations hub in Santos runs the call: one set of procedures, one way of documenting the work.

Field notesOperations hub · 24/7

Local know-how for this port — where ships wait at anchor, where the pilot boards, which berths tend to slip and what each terminal asks of a ship — is being written up. Until it is here, talk to us before fixing the plan.

In preparation

Tides
Tide tables of the Brazilian Navy (DHN)
Request a proposal

Tools for the call02

06Terms

The words on this page.

Chart datum
The level the Navy’s charts and tide tables are measured from, set near the lowest tides: depths are counted below it, tide heights above it.
Draft
How deep a ship floats, from the waterline down to the bottom of her keel. A port’s maximum draft is the deepest a ship may float to enter, lie alongside or sail.
Under-keel clearance
The water left between the keel and the seabed. Pilots and the port authority set the least a ship must keep, passage by passage and berth by berth.
Length overall (LOA)
The ship’s length from her foremost point to her aftmost.

07Questions

What planners ask about Pecém.

How deep a draft can Pecém take?

Deepest berth draft: 15.40 m (Pier 2, berths 3 and 4: static draft with a 0.30 m under-keel clearance). Source: Capitania dos Portos do Ceará, Marinha do Brasil, Normas e Procedimentos da Capitania dos Portos do Ceará (NPCP-CE), capítulo 5.

Which months are wettest at Pecém?

At the Fortaleza INMET station, 43 km away, April is the wettest month with 385 mm of rain and October the driest with 10 mm; the year totals 1,584 mm (normals 1991–2020). The mean daily maximum runs from 30.5 °C in June to 31.7 °C in November.

What can Seachios do for a ship at Pecém?

Cargo Hold Cleaning · Underwater Services · General Ship Repair · Shipping Agency, coordinated by our operations hub in Santos, open 24/7.

08Sources

The documents behind the figures.

  1. [1]Capitania dos Portos do Ceará, Marinha do Brasil. Normas e Procedimentos da Capitania dos Portos do Ceará (NPCP-CE), capítulo 5. Portaria nº 84/CPCE, de 09/12/2025. Read Nov 18, 2026.
  2. [2]Instituto Nacional de Meteorologia (INMET), via WMO and NOAA NCEI. WMO Climatological Standard Normals 1991–2020: Fortaleza (82397). NCEI accession 0253808, version 2.2. Read Nov 18, 2026.

Port information sheet

Everything on this page on one drawing sheet: the limits and their rules, the berths, the tide, the climate, the services, the questions and the sources.

SC-REQ-01Request for serviceOperations online · Santos --:--:-- BRT

ContactOperations hub · 24/7

Plan your next job in Brazil. Our operations hub replies 24/7.

Send the vessel, the port and the dates. We reply with a plan, a team and a timetable.

Response
30–60 min
Ports
12 · 04 Regions
Operations hub
Santos · 24/7

What to send

  1. 01The vessel and its IMO number
  2. 02The port, the berth or anchorage, and the dates
  3. 03The service, and what the work involves
  4. 04A plan from one of our tools, if you made one