Operations online · Santos --:--:-- BRTSC-PORT-003
Pecém CE · Brazil
Pecém is the port complex of São Gonçalo do Amarante, west of Fortaleza, in Ceará: an offshore terminal sheltered by a breakwater, with two piers and a multipurpose quay (TMUT). With no dredged channel, ships of up to 366 m approach straight from the sea.
- 15.40 m
- Max draft
- 1,584 mm
- Annual rainfall
- 03°32′S 038°49′W
- Position
- Nov 18, 2026
- Last checked
01/Port profile
Pecém in figures.
The Capitania dos Portos do Ceará lists, for each of the ten berths, the static draft (with a 0.30 m under-keel clearance), the draft allowed without a tide window and the largest ship it takes. At the INMET station in Fortaleza, 43 km away, rain totals 1,584 mm a year; April is the wettest month and October the driest.
Port particulars
- Region
- Northeast · CE
- Position
- 03°32′S 038°49′W
- Weather station
- Fortaleza · 43 km
- Last checked
- Nov 18, 2026
- Sources
- 02
By sea from Santos1,796 NM≈ 150 h at 12 kn
02/Access
Channel and berth limits.
The channel and berth limits in force, each numbered to the document that sets it. Drafts are given in metres over chart datum.
- Deepest berth draft
- 15.40 m[1]
- Pier 2, berths 3 and 4: static draft with a 0.30 m under-keel clearance
- Longest ship accepted
- 366 m[1]
- TMUT berths 5, 9 and 10, beam up to 52 m
- Berths
- 10[1]
- Piers 1 and 2 and the multipurpose terminal (TMUT)
- 01Pecém has no dredged access channel: ships approach from the pilot boarding point to the turning basin between the piers, and the drafts assume no negative tide.[1]
- 02Tide needed to berth = the ship’s largest draft minus the draft allowed without a tide window; a negative tide lowers the recommended draft by as much.[1]
- 03On the TMUT the under-keel clearance falls to 0.24 m between bollards 25 and 26, and depths of 14.84 m are found between bollards 52 and 56.[1]
- 04LNG carriers at berths 3 and 4 should berth by day; manoeuvres are recommended with wind up to 24 knots.[1]
- 05Speed limit 7 knots; crossing and overtaking are not recommended in manoeuvring areas 1 and 2.[1]
- 06Between two ships on the TMUT, the gap depends on the larger LOA: 30 m below 200 m, 37.5 m up to 250 m, 45 m up to 300 m and 15 % of the LOA above 300 m.[1]
- 07The table rests on the port company’s study DIENG 184-2020 (CIPP S.A.), with dynamic and static drafts and under-keel clearances for the design ships.[1]
03/Berths
The berth table. The largest ship each berth takes.
As the Harbour Master’s rules list them, terminal by terminal: length overall, beam and draft in metres, without and with the tide.
How many berths take each draft
- 10 m10 / 10
- 11 m10 / 10
- 12 m10 / 10
- 13 m9 / 10
- 14 m0 / 10
- 15 m0 / 10
Counted without the tide.
| Píer 1 | ||||
|---|---|---|---|---|
| Berço 1 (cabeços 01–16) | 280.0 | 38.0 | 12.11 | 14.00 |
| Berço 2 (cabeços 00–16) | 300.0 | 47.0 | 13.20 | 14.70 |
| Píer 2 | ||||
| Berço 3 (cabeços 01–10) | 290.0 | 46.0 | 13.32 | 15.40 |
| Berço 4 (cabeços 01–10) | 310.0 | 52.0 | 13.32 | 15.40 |
| TMUT, Terminal de Múltiplo Uso | ||||
| Berço 5 (cabeços 00–11) | 366.0 | 49.0 | 13.20 | 15.30 |
| Berço 6 (cabeços 11–20) | 280.0 | 38.0 | 13.20 | 15.30 |
| Berço 7 (cabeços 20–28) | 300.0 | 47.0 | 13.20 | 15.30 |
| Berço 8 (cabeços 28–35) | 290.0 | 46.0 | 13.20 | 15.30 |
| Berço 9 (cabeços 35–45) | 366.0 | 52.0 | 13.20 | 15.30 |
| Berço 10 (cabeços 45–56) | 366.0 | 52.0 | 13.20 | 15.30 |
Source [1] · The check reads the table’s drafts and nothing else. Keel clearance, trim and the height of tide at berthing are settled with our team and the pilots before the call.
04/Climate
Rain and heat through the year.
Long-term monthly averages (1991–2020) recorded by INMET at Fortaleza, a station 43 km from the port.
| Month | Rain, mm | Rain days | Max, °C | Min, °C |
|---|---|---|---|---|
| Jan | 156.4 | 13.0 | 31.2 | 24.5 |
| Feb | 187.0 | 14.0 | 31.1 | 24.3 |
| Mar | 336.9 | 20.3 | 30.8 | 23.9 |
| Apr | 385.0 | 21.0 | 30.6 | 23.8 |
| May | 229.0 | 15.9 | 30.8 | 23.8 |
| Jun | 130.0 | 10.0 | 30.5 | 23.2 |
| Jul | 69.7 | 6.6 | 30.6 | 22.8 |
| Aug | 20.0 | — | 31.1 | 22.9 |
| Sep | 13.6 | 2.6 | 31.4 | 23.6 |
| Oct | 9.5 | 2.6 | 31.6 | 24.3 |
| Nov | 9.8 | 2.7 | 31.7 | 24.7 |
| Dec | 37.1 | 5.4 | 31.7 | 24.9 |
| Year | 1,584.0 | — | ||
Source [2] · Days with rain count those with 1 mm or more. Where the normals hold no figure for a month, the table shows a dash.
05/Services
Our services at this port.
Whatever the port, our operations hub in Santos runs the call: one set of procedures, one way of documenting the work.
Field notesOperations hub · 24/7
Local know-how for this port — where ships wait at anchor, where the pilot boards, which berths tend to slip and what each terminal asks of a ship — is being written up. Until it is here, talk to us before fixing the plan.
In preparation
- Tides
- Tide tables of the Brazilian Navy (DHN)
- SVC-01Cargo holdsPecémCargo Hold CleaningBulk carrier holds cleaned to grain or hospital standard in Brazilian ports, with robotic hydroblasting and no cure, no pay terms.180,000+cargo holds cleaned since 198095%less laycan downtime5 holds / 36 hwith robotic unitsAbout Cargo Hold Cleaning
- SVC-03Below the waterlinePecémUnderwater ServicesHull cleaning, propeller polishing, sea chest work and inspection support by commercial divers, with HD video, in Brazilian ports.24/7operational response4Kphoto and video records30+Brazilian service pointsAbout Underwater Services
- SVC-05Repairs afloatPecémGeneral Ship RepairRepairs afloat in Brazilian ports: cranes, hold steel, welding, leaks, thickness gauging and emergency work by riding squads.24/7riding squadsUTclass-accepted thickness gaugingAfloatno drydock delayAbout General Ship Repair
- SVC-06At the berthPecémShipping AgencyPort agency in Brazil for owners and charterers: pre-arrival to final DA, husbandry, crew changes and protective agency.PDA → DAone accountable agentOPAowners’ interests protected24/7port call coordinationAbout Shipping Agency
Tools for the call02
- T-03Statement · PDF · QR codeToolLaytime & demurrage calculatorCharter party terms and port call times turned into laytime, demurrage or despatchOpen instruments, no sign-up
- T-01Plan · PDF · QR codeToolHold cleaning plannerWhat a cargo change requires: standard, days, inspection risk and methodOpen instruments, no sign-up
06/Terms
The words on this page.
- Chart datum
- The level the Navy’s charts and tide tables are measured from, set near the lowest tides: depths are counted below it, tide heights above it.
- Draft
- How deep a ship floats, from the waterline down to the bottom of her keel. A port’s maximum draft is the deepest a ship may float to enter, lie alongside or sail.
- Under-keel clearance
- The water left between the keel and the seabed. Pilots and the port authority set the least a ship must keep, passage by passage and berth by berth.
- Length overall (LOA)
- The ship’s length from her foremost point to her aftmost.
07/Questions
What planners ask about Pecém.
How deep a draft can Pecém take?
Deepest berth draft: 15.40 m (Pier 2, berths 3 and 4: static draft with a 0.30 m under-keel clearance). Source: Capitania dos Portos do Ceará, Marinha do Brasil, Normas e Procedimentos da Capitania dos Portos do Ceará (NPCP-CE), capítulo 5.
Which months are wettest at Pecém?
At the Fortaleza INMET station, 43 km away, April is the wettest month with 385 mm of rain and October the driest with 10 mm; the year totals 1,584 mm (normals 1991–2020). The mean daily maximum runs from 30.5 °C in June to 31.7 °C in November.
What can Seachios do for a ship at Pecém?
Cargo Hold Cleaning · Underwater Services · General Ship Repair · Shipping Agency, coordinated by our operations hub in Santos, open 24/7.
08/Sources
The documents behind the figures.
- [1]Capitania dos Portos do Ceará, Marinha do Brasil. Normas e Procedimentos da Capitania dos Portos do Ceará (NPCP-CE), capítulo 5. Portaria nº 84/CPCE, de 09/12/2025. Read Nov 18, 2026.
- [2]Instituto Nacional de Meteorologia (INMET), via WMO and NOAA NCEI. WMO Climatological Standard Normals 1991–2020: Fortaleza (82397). NCEI accession 0253808, version 2.2. Read Nov 18, 2026.
Port information sheet
Everything on this page on one drawing sheet: the limits and their rules, the berths, the tide, the climate, the services, the questions and the sources.
The data as CSV
Contact/Operations hub · 24/7
Plan your next job in Brazil. Our operations hub replies 24/7.
Send the vessel, the port and the dates. We reply with a plan, a team and a timetable.
- Response
- 30–60 min
- Ports
- 12 · 04 Regions
- Operations hub
- Santos · 24/7
What to send
- 01The vessel and its IMO number
- 02The port, the berth or anchorage, and the dates
- 03The service, and what the work involves
- 04A plan from one of our tools, if you made one