Operations online · Santos --:--:-- BRTSC-TOOL-04
How many hands, and how many days?
Name the ship and the location, add the work packages with their quantities and norms, and set the shifts and the people on board. The planner works out the man-hours, the crew, a schedule with its critical path, the permits, class attendance and the documents: a technical plan to share, save or send with your request.
- Schedule · PDF · QR code
- Output
- 17
- Packages
- 6
- Disciplines
- Operations hub, 24/7
- Response
Plan repairs afloat: work packages by trade with their quantities and planning norms, man-hours, a crew within a limit, a schedule with its critical path, permits, class attendance and the documents, with a PDF and a shareable link.
Ship & work
01Ship & site
Who, where and under which class
02Work packages
Each with its quantity and its norm in man-hours: both yours to change
STSteel & structure
MCMachinery
DKDeck
PPPiping
ELElectrical & automation
SFSafety & LSA
03Shifts & people
How the job is manned, and what the ship allows
12 h a day, 10 h of work
Where the work lies
SC-RP-001Point at a mark or a row to see where its work lies.
Man-hours
05 packages479man-hours
Planning norms, confirmed by our engineers on survey.
Days & crew
AGW/WP7days
66 working hours · 10 h a day
- Peak crew
- 15
- Cap
- 16
- Packages
- 5
- Class
- DNV
Main engine work immobilises the ship: the port must agree to it.
Schedule
D1–D7 · critical path in blueCrew by day
peak 15 / cap 16The most people at work in each day, against the cap on board.
Permits & deliverables
16Before work starts
- Work permit for repairs afloat from the port authority or the terminal
- The ship’s permit-to-work system: isolations and lock-out before each job
- Risk assessment and a toolbox talk at the start of each shift
- Hot work permit, fire watch and gas tests before each shift
- Gas-free certificate issued by a chemist
- Enclosed space entry permit, the atmosphere tested
- Class notified, the surveyor booked for the packages it attends
What you receive
- A service report for each package, with photos before and after
- The class survey report, the condition of class cleared
- Material certificates (EN 10204 3.1) for steel and pipe
- Welders’ qualifications and the welding procedures used
- NDT reports (MPI and UT)
- Load test certificates
- Pressure test records
- Engine test run log
- The maintenance records brought up to date
Class attendance
DNV- 01Steel renewal
- 02Main engine unit overhaul
- 03Deck crane repair and load test
- 04Hatch cover packing and cleats
The surveyor is booked for these packages; the class survey closes the job.
Share
QRScan the code to reopen this plan.
Times are estimates, all going well and weather permitting, and depend on the vessel’s availability.
A technical plan for repairs afloat, subject to a survey of the work and an official quotation.
02/How to use
Four steps, a plan ready to share.
Results change as you type, and nothing is sent until you decide to send the plan.
- 01
Name the ship and the site
The vessel, its class society, the port, and a berth or anchorage.
Go to the ship - 02
Add the work packages
Switch on each package, give its quantity and, if your yard’s norm differs, its man-hours per unit: the man-hours follow.
Go to the work - 03
Set the shifts and the people
One shift or two, the most people the ship takes at once, the gas-free certificate, the cargo work around the repairs.
Go to the shifts - 04
Keep it, share it or attach it
Days, crew, schedule, permits and class attendance change as you edit. Copy the link, scan the QR code, save the PDF or send the plan with your request.
Go to the plan
03/Method
How the plan is worked out.
Planning norms for repairs afloat, package by package: you can change each one, and our engineers confirm them when they survey the work.
| Package | Norm | Team |
|---|---|---|
| ST Steel renewal | 120 / t | 6 |
| ST Crack repair by welding | 8 / m | 3 |
| ST Doubler or cement box | 16 / pcs | 3 |
| MC Main engine unit overhaul | 60 / cyl | 5 |
| MC Auxiliary engine overhaul | 90 / eng | 4 |
| MC Pump overhaul | 14 / pcs | 2 |
| MC Purifier or compressor overhaul | 12 / pcs | 2 |
| MC Boiler tube repair | 6 / tubes | 3 |
| DK Deck crane repair and load test | 48 / cranes | 4 |
| DK Hatch cover packing and cleats | 0.8 / m | 4 |
| DK Windlass or mooring winch overhaul | 40 / pcs | 4 |
| PP Pipe renewal up to DN150 | 3.5 / m | 3 |
| PP Valve overhaul | 3 / pcs | 2 |
| EL Electric motor rewinding | 30 / pcs | 2 |
| EL Alarm, monitoring or switchboard faults | 16 / systems | 2 |
| SF Lifeboat and davit repair | 20 / sets | 3 |
| SF Fire-fighting system repair | 16 / systems | 2 |
- Man-hours
- Quantity × the norm per unit, weighed for anchorage and for cargo work around the deck jobs.
- Teams
- Each package has its own team; under the cap on people it waits for room, or runs with fewer.
- Hot work
- Waits for the gas-free certificate; NDT follows the last weld.
- Tests
- Load, pressure, hose and function tests, and the engine’s test run, after the packages that need them.
- Class
- The surveyor attends the packages that need it; the class survey closes the job.
- Shifts
- One shift gives 10 h of work a day; two give 19, the night at 90 %.
04/FAQ
Questions we are asked most often.
01Does the plan include a price?
No. It is a technical plan of the man-hours, the crew, the schedule, the permits and the documents. The formal quotation follows a survey of the work by our team; the planner never calculates a price.
02Where do the man-hour norms come from?
They are planning norms for repairs afloat, by unit of work: a tonne of steel renewed, a metre of crack welded, a cylinder overhauled. Each one is yours to change, so the plan can follow your own yard’s or superintendent’s figures.
03How is the schedule built?
Arrival and induction first, gas-freeing before any hot work, then the packages — steel ahead, the longest first — each with its team, never more people at once than the cap you set. NDT follows the welding, then the tests and trials, the class survey and the handover.
04What is the critical path?
The chain of tasks that sets the end of the job: shorten any of them and the job ends sooner. The schedule draws it in the blue, its links dashed.
05Why does the location matter?
At anchorage people and materials come by launch and crane, and the weather has its say: the planner weighs the man-hours by about a sixth. Heavy steel work is better done at a berth or in a shipyard.
06Which packages need the class surveyor?
Structural steel and welding, main engine work, boiler repairs, crane load tests, hatch cover tightness, life-saving appliances and fire-fighting systems. The plan lists them, books the surveyor and ends on the class survey.
07Is my data saved anywhere?
No. The data stays in your browser, and nothing is sent until you submit the plan through the contact page and add your details there.