Operations online · Santos --:--:-- BRTSC-PORT-005
Maceió AL · Brazil
Maceió is the port of Alagoas, at Jaraguá. Its access channel, about 1,000 m long and 120 m wide, is 11 m deep, as is the turning basin; the maximum recommended draft is 11 m in the channel and at berths 5 and 7, 10.5 m at berths 2, 3, 4 and 6 and 10 m at berth 1, for ships up to 330 m long.
- 11.0 m
- Max draft
- 1.41 m
- Mean tide range
- 09°41′S 035°44′W
- Position
- Nov 18, 2026
- Last checked
01/Port profile
Maceió in figures.
The Navy's 2026 predictions for Porto de Maceió give a mean tidal range of 1.41 m, with mean sea level 1.16 m above chart datum. In INMET's 1961–1990 normals for Maceió, rain totals 2,168 mm a year; May is the wettest month and November the driest.
Port particulars
- Region
- Northeast · AL
- Position
- 09°41′S 035°44′W
- Tide gauge
- Porto de Maceió · 0.7 km
- Weather station
- Maceió
- Last checked
- Nov 18, 2026
- Sources
- 03
By sea from Santos1,228 NM≈ 102 h at 12 kn
02/Access
Channel and berth limits.
The channel and berth limits in force, each numbered to the document that sets it. Drafts are given in metres over chart datum.
- Channel maximum operating draft
- 11.0 m[1]
- Access channel; above 10.50 m only on the flood, with at least 1.0 m of tide
- Deepest berth draft
- 11.0 m[1]
- Berths 5 and 7; 10.5 m at berths 2, 3, 4 and 6, 10 m at berth 1
- Channel depth
- 11 m[1]
- About 1,000 m long; turning basin 400 × 360 m, also 11 m
- Channel width, limiting
- 120 m[1]
- One-way traffic, beam up to 40 m
- Longest ship accepted
- 330 m[1]
- Over 220 m only with bow and stern thrusters or azimuth propulsion
- 01Ships deeper than 10.50 m, up to 11 m, use the access channel only on the flood, with at least 1.0 m of tide, keeping more than 1.0 m under the keel.[1]
- 02Ships between 220 and 330 m berth and unberth only with working bow and stern thrusters or azimuth propulsion.[1]
- 03Berth 5 takes ships up to 240 m when berths 4 and 6 are occupied.[1]
- 04Berths 2, 3, 5 and 6 take ships up to 60,000 DWT; berth 4 up to 65,000 DWT, under the displacement condition the rule sets.[1]
- 05The access channel is one-way, with no overtaking, at 5 knots at most; from the pilot boarding point to the port the limit is 6 knots.[1]
- 06At the Braskem chemical terminal the draft is 8.84 m, for ships up to 170 m between perpendiculars and 32 m in beam; ships over 150 m berth and unberth by daylight.[1]
03/Berths
The berth table. The maximum draft at each berth.
As the port authority or the Harbour Master publishes them, berth by berth, in metres. Type a draft to see which berths take it.
How many berths take each draft
- 10 m7 / 8
- 11 m2 / 8
- 12 m0 / 8
- 13 m0 / 8
- 14 m0 / 8
- 15 m0 / 8
Counted on each berth’s maximum draft.
| Porto de Maceió | |
|---|---|
| Berço 1 | 10.00 |
| Berço 2 | 10.50 |
| Berço 3 | 10.50 |
| Berço 4 | 10.50 |
| Berço 5 | 11.00 |
| Berço 6 | 10.50 |
| Berço 7 | 11.00 |
| Terminal Químico (Braskem) | |
| Plataforma de operação | 8.84 |
Source [1] · The check reads the table’s drafts and nothing else. Keel clearance, trim and the height of tide at berthing are settled with our team and the pilots before the call.
04/Tides
Tide levels on the staff.
Computed from the 2026 tide tables of the Brazilian Navy (DHN) for Porto de Maceió, a station 0.7 km from the port. Every height is in metres over chart datum.
- Mean range
- 1.41 m[2]
- Mean high water
- 1.87 m[2]
- Mean sea level
- 1.16 m[2]
- Mean low water
- 0.46 m[2]
- Highest predicted
- 2.40 m[2]
- Lowest predicted
- -0.07 m[2]
The means are taken over all 1,411 tides predicted for 2026 at Porto de Maceió; the extremes are the highest and lowest of them. Harmonic constituents: 53; nautical chart 921.
05/Climate
Rain and heat through the year.
Long-term monthly averages for Maceió (1961–1990): INMET’s figures, as the World Meteorological Organization’s weather service carries them.
| Month | Rain, mm | Rain days | Max, °C | Min, °C |
|---|---|---|---|---|
| Jan | 74.8 | 12.0 | 30.2 | 22.4 |
| Feb | 111.0 | 14.0 | 30.4 | 22.6 |
| Mar | 191.0 | 19.0 | 30.2 | 22.7 |
| Apr | 312.6 | 20.0 | 29.6 | 22.5 |
| May | 340.7 | 22.0 | 28.5 | 22.0 |
| Jun | 298.3 | 25.0 | 27.6 | 21.3 |
| Jul | 325.1 | 25.0 | 27.0 | 20.5 |
| Aug | 179.0 | 21.0 | 27.1 | 20.2 |
| Sep | 148.4 | 18.0 | 27.8 | 20.7 |
| Oct | 72.7 | 15.0 | 29.0 | 21.2 |
| Nov | 51.9 | 9.0 | 29.9 | 21.6 |
| Dec | 62.1 | 12.0 | 30.0 | 22.0 |
| Year | 2,167.6 | 212.0 | ||
Source [3] · Days with rain count those with 0.1 mm or more. Where the normals hold no figure for a month, the table shows a dash.
06/Services
Our services at this port.
Whatever the port, our operations hub in Santos runs the call: one set of procedures, one way of documenting the work.
Field notesOperations hub · 24/7
Local know-how for this port — where ships wait at anchor, where the pilot boards, which berths tend to slip and what each terminal asks of a ship — is being written up. Until it is here, talk to us before fixing the plan.
Request a proposal- SVC-01Cargo holdsMaceióCargo Hold CleaningBulk carrier holds cleaned to grain or hospital standard in Brazilian ports, with robotic hydroblasting and no cure, no pay terms.180,000+cargo holds cleaned since 198095%less laycan downtime5 holds / 36 hwith robotic unitsAbout Cargo Hold Cleaning
- SVC-03Below the waterlineMaceióUnderwater ServicesHull cleaning, propeller polishing, sea chest work and inspection support by commercial divers, with HD video, in Brazilian ports.24/7operational response4Kphoto and video records30+Brazilian service pointsAbout Underwater Services
- SVC-05Repairs afloatMaceióGeneral Ship RepairRepairs afloat in Brazilian ports: cranes, hold steel, welding, leaks, thickness gauging and emergency work by riding squads.24/7riding squadsUTclass-accepted thickness gaugingAfloatno drydock delayAbout General Ship Repair
- SVC-06At the berthMaceióShipping AgencyPort agency in Brazil for owners and charterers: pre-arrival to final DA, husbandry, crew changes and protective agency.PDA → DAone accountable agentOPAowners’ interests protected24/7port call coordinationAbout Shipping Agency
Tools for the call02
- T-03Statement · PDF · QR codeToolLaytime & demurrage calculatorCharter party terms and port call times turned into laytime, demurrage or despatchOpen instruments, no sign-up
- T-01Plan · PDF · QR codeToolHold cleaning plannerWhat a cargo change requires: standard, days, inspection risk and methodOpen instruments, no sign-up
07/Terms
The words on this page.
- Chart datum
- The level the Navy’s charts and tide tables are measured from, set near the lowest tides: depths are counted below it, tide heights above it.
- Draft
- How deep a ship floats, from the waterline down to the bottom of her keel. A port’s maximum draft is the deepest a ship may float to enter, lie alongside or sail.
- Under-keel clearance
- The water left between the keel and the seabed. Pilots and the port authority set the least a ship must keep, passage by passage and berth by berth.
- Mean tide range
- The average rise from low water to high water over all the tides predicted for the year.
- Length overall (LOA)
- The ship’s length from her foremost point to her aftmost.
08/Questions
What planners ask about Maceió.
How deep a draft can Maceió take?
Deepest berth draft: 11.0 m (Berths 5 and 7; 10.5 m at berths 2, 3, 4 and 6, 10 m at berth 1). Source: Capitania dos Portos de Alagoas, Marinha do Brasil, Normas e Procedimentos da Capitania dos Portos de Alagoas (NPCP-AL), anexo 4-A.
How big is the tide at Maceió?
The average range is 1.41 m, from a mean high water of 1.87 m to a mean low water of 0.46 m above chart datum, across the 1,411 high and low waters the Navy forecasts for 2026 at Porto de Maceió. Mean sea level is 1.16 m above chart datum.
Which months are wettest at Maceió?
In the INMET normals for Maceió, May is the wettest month with 341 mm of rain and November the driest with 52 mm; the year totals 2,168 mm (normals 1961–1990). The mean daily maximum runs from 27.0 °C in July to 30.4 °C in February.
What can Seachios do for a ship at Maceió?
Cargo Hold Cleaning · Underwater Services · General Ship Repair · Shipping Agency, coordinated by our operations hub in Santos, open 24/7.
09/Sources
The documents behind the figures.
- [1]Capitania dos Portos de Alagoas, Marinha do Brasil. Normas e Procedimentos da Capitania dos Portos de Alagoas (NPCP-AL), anexo 4-A. 1ª revisão, 2025; parâmetros da Instrução APMC nº 091/2019. Read Nov 18, 2026.
- [2]Marinha do Brasil, Centro de Hidrografia da Marinha (DHN). Tábuas das Marés 2026: Porto de Maceió (Estado de Alagoas). 53 componentes, nível médio 1.16 m, carta 921. Read Nov 18, 2026.
- [3]Instituto Nacional de Meteorologia (INMET), via the World Meteorological Organization (WMO). World Weather Information Service: Maceió, climatological information. INMET normals 1961–1990, provided to the WMO on 2004-08-02. Read Nov 18, 2026.
Port information sheet
Everything on this page on one drawing sheet: the limits and their rules, the berths, the tide, the climate, the services, the questions and the sources.
The data as CSV
Contact/Operations hub · 24/7
Plan your next job in Brazil. Our operations hub replies 24/7.
Send the vessel, the port and the dates. We reply with a plan, a team and a timetable.
- Response
- 30–60 min
- Ports
- 12 · 04 Regions
- Operations hub
- Santos · 24/7
What to send
- 01The vessel and its IMO number
- 02The port, the berth or anchorage, and the dates
- 03The service, and what the work involves
- 04A plan from one of our tools, if you made one