Operations online · Santos --:--:-- BRTSC-TOOL-01
Can the holds be ready before the vessel sails?
Describe the vessel, the holds, the cargo change, the port and the days available. The planner works out the standard required, the time the job needs, the inspection risk and the method: a technical plan to share, save or send with your request for a quotation.
- Plan · PDF · QR code
- Output
- 07:00–18:00
- Shift
- 5 × 500 bar · fresh water
- Equipment
- Operations hub, 24/7
- Response
Plan a cargo hold cleaning for your port stay: the standard the next cargo needs, the days the job takes, the inspection risk and the method, with a PDF and a shareable link.
Vessel & operation
01Vessel
Name, IMO number and flag are optional; the size sets the plan view
02Holds & cargo
The next cargo decides the standard
03Operation
Place, days and crews: the cleaning time is compared with the stay
04Add-ons
Extra work added to the job
Plan view
SC-PLN-001SC-PLN-001SupramaxLOA 190 mB 32.26 m5 holds50–60k DWTScale NTS
Laytime estimation
AGW/WP2–3days
22–33 h of shift work · 07:00–18:00 (11 h)
Fits the stay1 d to spare
- Standard
- 2–3 d
- Holds
- × 1.00
- Crews
- × 1.00
- Previous cargo
- × 1.00
- Add-ons
- + 0 d
5 fresh-water hydro-jet units · 500 bar
An estimate only: the actual condition of the holds can shorten or lengthen the job.
Inspection risk
Low
- Grain clean calls for dry holds without odour
- A fresh-water rinse at 500 bar and a wipe test before the surveyor arrives
Cleaning standard
GRAINGrain clean
Dry and odour-free, with no loose rust or residue left
CoalCorn
Policy
NO CURE, NO PAY
Within a reasonable cleaning time
Method
07- 01Sweeping and residue removal
- 02Sea-water pre-wash · fire hoses
- 03Chemical treatment
- 04Sea-water wash
- 05Fresh-water hydro-jetting · 500 bar
- 06Controlled drying & ventilation
- 07Inspection · white-rag test
Chemical: Coal-dust degreaser
Share
QRScan the code to reopen this plan.
Times are estimates, all going well and weather permitting, and depend on the vessel’s availability.
A technical estimate of the work and its duration, subject to a formal quotation.
02/How to use
Four steps, a plan ready to share.
Results change as you type, and nothing is sent until you decide to send the plan.
- 01
Describe the vessel
Name, IMO number and flag are optional; the size class sets the length and beam of the plan view.
Go to the vessel - 02
Holds and cargo change
The number of holds divides the cargo length, and the next cargo decides the standard: grain, hospital or normal clean.
Go to the cargo - 03
Give the place and the stay
The port, anchorage or berth, the days available, the crews and any extra work: the cleaning time is compared with that stay.
Go to the operation - 04
Keep it, share it or attach it
Standard, time, inspection risk and method change as you edit. Copy the link, scan the QR code, save the PDF or send the plan with your request.
Go to the plan
03/Method
How the estimate is worked out.
Our own job records are built into the planner: it calculates time, standard and risk, never a price.
| Standard | Next cargo | Reference days | Ceiling |
|---|---|---|---|
| Hospital clean | Woodpulp, Alumina | 3–4 days | 4 days |
| Grain clean | Corn, Soybeans, Sugar | 2–3 days | 4 days |
| Normal clean | Fertiliser, Iron ore, Coal, Steel products | 2–2.5 days | 4 days |
- Holds
- A seven-hold ship adds about half a day to the upper estimate; ships with fewer holds need less.
- Previous cargo
- Coal, iron ore and grain set the baseline; fertiliser, metcoke, petcoke and clinker take a little longer.
- Crews & add-ons
- Each extra crew saves less time than the last; scraping and rust treatment add about a quarter of a day each.
- Time in port
- It fits if the stay covers the longest estimate, is tight if it covers only the shortest, and overruns otherwise.
- Inspection risk
- Low for a standard job; higher for a hospital clean, a filming or salty residue, or a short stay.
- Washing order
- Pre-wash with sea water and fire hoses, chemical application, sea-water wash, then fresh-water hydrojets at 500 bar.
04/FAQ
Questions we are asked most often.
01Does the plan include a price?
No. It is a technical estimate of the standard, the time, the inspection risk and the method. Our operations hub sends the formal quotation after you submit the plan; the planner never calculates a price.
02How reliable is the time estimate?
It is an estimate, all going well and weather permitting, based on our own job records: five fresh-water hydrojet units at 500 bar, two to three days for five holds to grain clean, three to four for hospital clean, and never more than four days. The condition of the holds can shorten or lengthen it.
03Who decides the cleaning standard?
The next cargo does: wood pulp and alumina require hospital clean, corn, soybeans and sugar grain clean, and other cargoes normal clean.
04Why does the planner need the days in port?
To compare the cleaning time with the vessel’s stay at anchor or at berth. The result shows whether the job fits, is tight or overruns, and suggests an extra crew or more days when needed.
05Is cleaning at berth possible?
Yes, with the port authority’s approval. The planner assumes anchorage unless you choose the berth and its days in the operation step.
07Is my data saved anywhere?
No. The data stays in your browser, and nothing is sent until you submit the plan through the contact page and add your details there.
08What comes next once the plan is sent?
Our operations hub checks the port and the dates, confirms feasibility and sends a formal quotation.