Operations online · Santos --:--:-- BRTSC-PORT-008
Rio de Janeiro RJ · Brazil
The port of Rio de Janeiro lies inside Guanabara Bay. Ships enter by the Cotunduba channel, with a draft of up to 15.85 m, and berth at the Commercial Quay (Gamboa and São Cristóvão) or at the TECON-RJ container terminals, where the channel takes 14.50 m, 15.30 m with tide, for ships up to 349 m long.
- 15.30 m
- Max draft
- 0.71 m
- Mean tide range
- 22°53′S 043°11′W
- Position
- Nov 18, 2026
- Last checked
01/Port profile
Rio de Janeiro in figures.
The Navy's 2026 predictions for Porto do Rio de Janeiro, Ilha Fiscal give a mean tidal range of 0.71 m, with mean sea level 0.73 m above chart datum. In INMET's 1961–1990 normals for Rio de Janeiro, rain totals 1,173 mm a year; December is the wettest month and August the driest.
PortosRio publishes the draft of every berth in its normative instruction 14.001.08. The table on this page is version 8.0, in force since 10 April 2026, quay by quay, with the bollards each berth spans.
Port particulars
- Region
- Southeast · RJ
- Position
- 22°53′S 043°11′W
- Terminals
- Niterói · Angra dos Reis
- Tide gauge
- Porto do Rio de Janeiro, Ilha Fiscal · 1.6 km
- Weather station
- Rio de Janeiro
- Last checked
- Nov 18, 2026
- Sources
- 03
By sea from Santos248 NM≈ 21 h at 12 kn
02/Access
Channel and berth limits.
The channel and berth limits in force, each numbered to the document that sets it. Drafts are given in metres over chart datum.
- Channel maximum operating draft
- 15.85 m[1]
- Cotunduba channel (Canal Varrido), the entrance to Guanabara Bay
- Channel draft, without / with tide
- 14.50 / 15.30 m[1]
- TECON-RJ channel and turning basin, ships up to 349 m long
- Deepest berth draft
- 15.30 m[1]
- TECON 1, 2, 3 and the extension, subject to the ramp-up
- Longest ship accepted
- 349 m[1]
- TECON-RJ, beam up to 52 m
- Berths
- 41[1]
- Berths and berth sections in the PortosRio table
- 01Container ships up to 12.60 m draft, with the sea at Beaufort 1 or less, and other ships up to 11.50 m may enter by the Santa Cruz channel (Barra Grande), day or night.[1]
- 02The access channel, from buoys 1 and 2 between the Navy Arsenal and Ilha das Enxadas, is one-way; it splits at Ilha das Enxadas into the Commercial Quay channel and the TECON-RJ channel, which has priority.[1]
- 03Commercial Quay channel: 10.30 m between bollards 36 and 110 (up to 11.00 m with 0.70 m of flood tide), 9.00 m between 110 and 129 (9.70 m) and 8.50 m between 129 and 205 (9.00 m).[1]
- 04Between bollards 36 and 129, a ship leaving may add up to 0.70 m of flood tide to the berth draft, never above the draft of its channel.[1]
- 05TECON-RJ berthing and unberthing take as reference wind up to 15 knots, gusts aside, and visibility of at least 2 nautical miles.[1]
- 06The 15.30 m drafts at TECON 1, 2, 3 and the extension depend on the ramp-up of larger ships the Capitania dos Portos do Rio de Janeiro approves.[1]
03/Berths
The berth table. The maximum draft at each berth.
As the port authority or the Harbour Master publishes them, berth by berth, in metres. Type a draft to see which berths take it.
How many berths take each draft
- 10 m9 / 41
- 11 m7 / 41
- 12 m6 / 41
- 13 m4 / 41
- 14 m4 / 41
- 15 m4 / 41
Counted on each berth’s maximum draft.
| Quadro de Boias de Manguinhos | |
|---|---|
| 2NRF Quadro de Boias de Manguinhos | 11.47 |
| Cais da Gamboa, cabeços 36 a 162 | |
| 2N01 ESMAPA, parte 1 (36–38) | — |
| 2N01 ESMAPA, parte 2 (38–43) | 5.30 |
| 2N02 Terminal de Passageiros 1 (43–53) | 8.90 |
| 2N03 Terminal de Passageiros 2 (53–62) | 8.90 |
| 2N04 Armazém 4 (62–70) | 8.90 |
| 2N04 Armazém 5 (70–73) | 9.50 |
| 2N05 Armazém 6, parte 1 (73–77) | 9.50 |
| 2N05 Armazém 6, parte 2 (77–79) | 9.60 |
| 2N06 Armazém 7, parte 1 (79–81) | 7.30 |
| 2N06 Armazém 7, parte 2 (81–86) | 8.20 |
| 2N06 Armazém 8 (86–90) | 9.00 |
| 2N07 Pátio 8/9 (90–100) | 10.50 |
| 2N08 Pátio 9 (100–110) | 10.50 |
| 2N09 Armazém 10 (110–116) | 9.50 |
| 2N10 Terminal de Trigo (116–124A) | 9.10 |
| 2N11 Armazém 13, parte 1 (125–129) | 9.10 |
| 2N11 Armazém 13, parte 2 (129–134) | 6.90 |
| 2P14 Terminal Petrobras, Armazém 14 (134–139) | 6.80 |
| 2P15 Terminal Petrobras, Armazém 15 (139–146) | 6.90 |
| 2N16 Armazém 16 (146–152) | 5.00 |
| 2N17 Armazém 17 (152–157) | 3.30 |
| 2N18 Armazém 18 (157–162) | 2.90 |
| Cais de São Cristóvão, cabeços 166 a 216 | |
| 2PAL Terminal Petrobras AL, parte 1 (166–170) | 3.90 |
| 2PAL Terminal Petrobras AL, parte 2 (170–175) | 6.00 |
| 2PAL Terminal Petrobras AL, parte 3 (175–178) | 5.80 |
| 2P19 Terminal Petrobras SC, parte 1 (178–180) | 5.80 |
| 2P19 Terminal Petrobras SC, parte 2 (180–190) | 8.10 |
| 2TS1 Terminal Siderúrgico, parte 1 (190–197) | 8.60 |
| 2NTO Terminal de Óleo (197–205) | 8.50 |
| 2TS2 Terminal Siderúrgico, parte 2 (205–209) | 8.60 |
| 2TS2 Terminal Siderúrgico, parte 3 (209–212) | 9.00 |
| 2TS2 Terminal Siderúrgico, parte 4 (212–214) | 9.00 |
| 2TS2 Terminal Siderúrgico, parte 5 (214–215) | 8.60 |
| 2TS2 Terminal Siderúrgico, parte 6 (215–216) | 4.30 |
| TECON-RJ | |
| 2R11 TECON 5, MCAR (DMC1–237) | 12.20 |
| 2R12 TECON 4, MCAR (237–244) | 12.50 |
| 2C21 TECON 3, MRIO (244–260) | 15.30 |
| 2C22 TECON 2, MRIO (260–277) | 15.30 |
| 2C11 TECON 1, ICTSI (277–290) | 15.30 |
| 2C12 TECON Prolongamento, ICTSI (290–309) | 15.30 |
Source [1] · The check reads the table’s drafts and nothing else. Keel clearance, trim and the height of tide at berthing are settled with our team and the pilots before the call.
04/Tides
Tide levels on the staff.
Computed from the 2026 tide tables of the Brazilian Navy (DHN) for Porto do Rio de Janeiro, Ilha Fiscal, a station 1.6 km from the port. Every height is in metres over chart datum.
- Mean range
- 0.71 m[2]
- Mean high water
- 1.10 m[2]
- Mean sea level
- 0.73 m[2]
- Mean low water
- 0.39 m[2]
- Highest predicted
- 1.49 m[2]
- Lowest predicted
- -0.13 m[2]
The means are taken over all 1,546 tides predicted for 2026 at Porto do Rio de Janeiro, Ilha Fiscal; the extremes are the highest and lowest of them. Harmonic constituents: 70; nautical chart 1515.
05/Climate
Rain and heat through the year.
Long-term monthly averages for Rio de Janeiro (1961–1990): INMET’s figures, as the World Meteorological Organization’s weather service carries them.
| Month | Rain, mm | Rain days | Max, °C | Min, °C |
|---|---|---|---|---|
| Jan | 114.1 | 12.0 | 29.4 | 23.3 |
| Feb | 105.3 | 9.0 | 30.2 | 23.5 |
| Mar | 103.3 | 9.0 | 29.4 | 23.3 |
| Apr | 137.4 | 10.0 | 27.8 | 21.9 |
| May | 85.6 | 8.0 | 26.4 | 20.4 |
| Jun | 80.4 | 6.0 | 25.2 | 18.7 |
| Jul | 56.4 | 6.0 | 25.3 | 18.4 |
| Aug | 50.5 | 6.0 | 25.6 | 18.9 |
| Sep | 87.1 | 9.0 | 25.0 | 19.2 |
| Oct | 88.2 | 10.0 | 26.0 | 20.2 |
| Nov | 95.6 | 11.0 | 27.4 | 21.4 |
| Dec | 169.0 | 13.0 | 28.6 | 22.4 |
| Year | 1,172.9 | 109.0 | ||
Source [3] · Days with rain count those with 0.1 mm or more. Where the normals hold no figure for a month, the table shows a dash.
06/Services
Our services at this port.
Whatever the port, our operations hub in Santos runs the call: one set of procedures, one way of documenting the work.
Field notesOperations hub · 24/7
Local know-how for this port — where ships wait at anchor, where the pilot boards, which berths tend to slip and what each terminal asks of a ship — is being written up. Until it is here, talk to us before fixing the plan.
Request a proposal- SVC-03Below the waterlineRio de JaneiroUnderwater ServicesHull cleaning, propeller polishing, sea chest work and inspection support by commercial divers, with HD video, in Brazilian ports.24/7operational response4Kphoto and video records30+Brazilian service pointsAbout Underwater Services
- SVC-05Repairs afloatRio de JaneiroGeneral Ship RepairRepairs afloat in Brazilian ports: cranes, hold steel, welding, leaks, thickness gauging and emergency work by riding squads.24/7riding squadsUTclass-accepted thickness gaugingAfloatno drydock delayAbout General Ship Repair
- SVC-02Fuel tanksRio de JaneiroTank CleaningFuel, slop and settling tanks cleaned and gas-freed in Brazilian ports, documented under MARPOL Annex I for safe fuel changeovers.4–7%lower fuel consumption≈15%lower maintenance costIMO 2020sulphur-limit readyAbout Tank Cleaning
- SVC-06At the berthRio de JaneiroShipping AgencyPort agency in Brazil for owners and charterers: pre-arrival to final DA, husbandry, crew changes and protective agency.PDA → DAone accountable agentOPAowners’ interests protected24/7port call coordinationAbout Shipping Agency
Tools for the call02
- T-03Statement · PDF · QR codeToolLaytime & demurrage calculatorCharter party terms and port call times turned into laytime, demurrage or despatchOpen instruments, no sign-up
- T-01Plan · PDF · QR codeToolHold cleaning plannerWhat a cargo change requires: standard, days, inspection risk and methodOpen instruments, no sign-up
07/Terms
The words on this page.
- Chart datum
- The level the Navy’s charts and tide tables are measured from, set near the lowest tides: depths are counted below it, tide heights above it.
- Draft
- How deep a ship floats, from the waterline down to the bottom of her keel. A port’s maximum draft is the deepest a ship may float to enter, lie alongside or sail.
- Under-keel clearance
- The water left between the keel and the seabed. Pilots and the port authority set the least a ship must keep, passage by passage and berth by berth.
- Mean tide range
- The average rise from low water to high water over all the tides predicted for the year.
- Length overall (LOA)
- The ship’s length from her foremost point to her aftmost.
08/Questions
What planners ask about Rio de Janeiro.
How deep a draft can Rio de Janeiro take?
Deepest berth draft: 15.30 m (TECON 1, 2, 3 and the extension, subject to the ramp-up). Source: PortosRio, Companhia Docas do Rio de Janeiro, Instrumento Normativo 14.001.08: Calados de Operação e Procedimentos Técnico-Operacionais do Porto do Rio de Janeiro.
How big is the tide at Rio de Janeiro?
The average range is 0.71 m, from a mean high water of 1.10 m to a mean low water of 0.39 m above chart datum, across the 1,546 high and low waters the Navy forecasts for 2026 at Porto do Rio de Janeiro, Ilha Fiscal. Mean sea level is 0.73 m above chart datum.
Which months are wettest at Rio de Janeiro?
In the INMET normals for Rio de Janeiro, December is the wettest month with 169 mm of rain and August the driest with 51 mm; the year totals 1,173 mm (normals 1961–1990). The mean daily maximum runs from 25.0 °C in September to 30.2 °C in February.
What can Seachios do for a ship at Rio de Janeiro?
Underwater Services · General Ship Repair · Tank Cleaning · Shipping Agency, coordinated by our operations hub in Santos, open 24/7.
09/Sources
The documents behind the figures.
- [1]PortosRio, Companhia Docas do Rio de Janeiro. Instrumento Normativo 14.001.08: Calados de Operação e Procedimentos Técnico-Operacionais do Porto do Rio de Janeiro. Versão 8.0, vigente desde 10/04/2026. Read Nov 18, 2026.
- [2]Marinha do Brasil, Centro de Hidrografia da Marinha (DHN). Tábuas das Marés 2026: Porto do Rio de Janeiro, Ilha Fiscal (Estado do Rio de Janeiro). 70 componentes, nível médio 0.73 m, carta 1515. Read Nov 18, 2026.
- [3]Instituto Nacional de Meteorologia (INMET), via the World Meteorological Organization (WMO). World Weather Information Service: Rio de Janeiro, climatological information. INMET normals 1961–1990, provided to the WMO on 2004-08-02. Read Nov 18, 2026.
Port information sheet
Everything on this page on one drawing sheet: the limits and their rules, the berths, the tide, the climate, the services, the questions and the sources.
The data as CSV
Contact/Operations hub · 24/7
Plan your next job in Brazil. Our operations hub replies 24/7.
Send the vessel, the port and the dates. We reply with a plan, a team and a timetable.
- Response
- 30–60 min
- Ports
- 12 · 04 Regions
- Operations hub
- Santos · 24/7
What to send
- 01The vessel and its IMO number
- 02The port, the berth or anchorage, and the dates
- 03The service, and what the work involves
- 04A plan from one of our tools, if you made one