Operations online · Santos --:--:-- BRTSC-PORT-014

Recife PE · Brazil

Recife is the port of the capital of Pernambuco, sheltered behind its reef and the English breakwater, with ten berths on 1,836 m of operational quay. Its ordinance of April 2024 caps the berthing draft at 11.00 m at zero tide, at berths 03 to 05; ships that need the tide berth by day, on the flood, and by night cargo ships are limited to 185 m. Seachios® keeps a base here, with its own crew and equipment.

11.00 m
Max draft
1.58 m
Mean tide range
08°04′S 034°52′W
Position
Nov 26, 2026
Last checked

01Port profile

Recife in figures.

The Navy's 2026 predictions for Porto do Recife give a mean tidal range of 1.58 m, with mean sea level 1.28 m above chart datum. In the 1991–2020 normals of INMET's Recife (Curado) station, 10 km from the port, rain totals 2,156 mm a year; June is the wettest month and November the driest.

Port particulars

Region
Northeast · PE
Position
08°04′S 034°52′W
Tide gauge
Porto do Recife · 0.5 km
Weather station
Recife (Curado) · 10 km
Last checked
Nov 26, 2026
Sources
05
SC-PORT-014Locator
0°10°S20°S30°S50°W40°WOperations hubRecifeN300 NM

By sea from Santos1,354 NM≈ 113 h at 12 kn

02Access

Channel and berth limits.

The channel and berth limits in force, each numbered to the document that sets it. Drafts are given in metres over chart datum.

Deepest berth draft
11.00 m[1]
Maximum berthing draft at zero tide, berths 03, 04 and 05
Longest ship accepted
235 m[1]
By day, ships without bow and stern thrusters; passenger ships with them up to 300 m
Channel width, limiting
170 m[2]
South access channel, widening to 255 m at the entrance bend
Channel length
3.4 km[2]
South access channel, the one large ships use
Berths
10[3]
Berths 00 to 09, on 1,836 m of quay available for operation
Longest berth
239.9 m[3]
Quay 09
  1. 01The maximum recommended draft in the channels is CMR = P − FAQ + H: 8.40 m plus the height of tide from 16 April to 30 September (under-keel clearance 1.7 m), and 8.80 m plus the tide from 1 October to 15 April (1.3 m).[1]
  2. 02Depths used for the CMR, at chart datum: 11.5 m at sea including the pilot boarding area, 10.1 m in the channel at the English breakwater, 11.1 m in the sheltered channel and 9.6 m at section B of chart 902.[1]
  3. 03The maximum berthing draft is CMA = P − FAQ + A, with an under-keel clearance of 0.30 m and A the lowest tide from berthing to 48 hours after the planned sailing; it is capped at 11.00 m.[1]
  4. 04Ships that need the tide to meet the CMR or CMA approach and berth by day only, on the flood, preferably from two hours before high water to high-water slack.[1]
  5. 05Two azimuth tugs of at least 40 t bollard pull must be available for every manoeuvre, and ships over 200 m are assisted by at least two.[1]
  6. 06By night, ships entering or leaving are limited to 185 m for cargo ships (general cargo and bulk) and 165 m for ships with dangerous cargo.[1]
  7. 07The maximum beam is 32.5 m for merchant ships and 42.0 m for passenger ships; at berths 07, 08 and 09, passenger ships with thrusters are limited to 210 m and a 6.50 m draft at zero tide.[1]
  8. 08Ships do not enter or leave with wind over 25 knots or visibility under 500 yards, and pure car carriers do not move by night or with wind over 20 knots.[1]
  9. 09The speed limit in the access channels and turning basins is 6 knots, and the minimum gap between ships when berthing is 10% of the overall length of the ship berthing.[1]

03Berths

The berth table. The maximum draft at each berth.

As the port authority or the Harbour Master publishes them, berth by berth, in metres. Type a draft to see which berths take it.

How many berths take each draft

  1. 10 m6 / 10
  2. 11 m3 / 10
  3. 12 m0 / 10
  4. 13 m0 / 10
  5. 14 m0 / 10
  6. 15 m0 / 10

Counted on each berth’s maximum draft.

m

Cais do Porto do Recife
Berço 0010.00
Berço 019.90
Berço 0210.90
Berço 0311.00
Berço 0411.00
Berço 0511.00
Berço 0610.70
Cais 078.00
Cais 088.00
Cais 098.00

Source [1] · The check reads the table’s drafts and nothing else. Keel clearance, trim and the height of tide at berthing are settled with our team and the pilots before the call.

04Tides

Tide levels on the staff.

Computed from the 2026 tide tables of the Brazilian Navy (DHN) for Porto do Recife, a station 0.5 km from the port. Every height is in metres over chart datum.

-0.00.51.01.52.02.52.59Highest predicted2.08Mean high water1.28Mean sea level0.50Mean low water0.04Lowest predicted0.00Chart datumMean range 1.58 mmHeights above chart datum · 2026
Mean range
1.58 m[4]
Mean high water
2.08 m[4]
Mean sea level
1.28 m[4]
Mean low water
0.50 m[4]
Highest predicted
2.59 m[4]
Lowest predicted
0.04 m[4]

The means are taken over all 1,411 tides predicted for 2026 at Porto do Recife; the extremes are the highest and lowest of them. Harmonic constituents: 16; nautical chart 902.

05Climate

Rain and heat through the year.

Long-term monthly averages (1991–2020) recorded by INMET at Recife (Curado), a station 10 km from the port.

2,156 mmrain in a year
391 mmJune, the wettest month
39 mmNovember, the driest month
010020030040018°22°26°30°34°mm°CJanFebMarAprMayJunJulAugSepOctNovDec
RainMaxMin
MonthRain, mmRain daysMax, °CMin, °C
Jan106.610.930.823.1
Feb127.010.731.023.3
Mar197.214.830.923.2
Apr268.916.730.422.8
May317.118.729.622.3
Jun390.522.128.521.5
Jul314.822.927.921.0
Aug186.718.527.920.7
Sep93.311.528.621.5
Oct52.88.729.622.4
Nov39.06.930.422.8
Dec61.67.830.823.0
Year2,155.5170.2

Source [5] · Days with rain count those with 1 mm or more. Where the normals hold no figure for a month, the table shows a dash.

06Services

Our services at this port.

Seachios® keeps a base at this port, with its own crews and equipment: a team is in many cases on board within 24 hours, and our operations hub in Santos runs the call with one set of procedures and one way of documenting the work.

Field notesOperations hub · 24/7

Local know-how for this port — where ships wait at anchor, where the pilot boards, which berths tend to slip and what each terminal asks of a ship — is being written up. Until it is here, talk to us before fixing the plan.

Request a proposal

Tools for the call03

07Terms

The words on this page.

Chart datum
The level the Navy’s charts and tide tables are measured from, set near the lowest tides: depths are counted below it, tide heights above it.
Draft
How deep a ship floats, from the waterline down to the bottom of her keel. A port’s maximum draft is the deepest a ship may float to enter, lie alongside or sail.
Under-keel clearance
The water left between the keel and the seabed. Pilots and the port authority set the least a ship must keep, passage by passage and berth by berth.
Mean tide range
The average rise from low water to high water over all the tides predicted for the year.
Length overall (LOA)
The ship’s length from her foremost point to her aftmost.

08Questions

What planners ask about Recife.

How deep a draft can Recife take?

Deepest berth draft: 11.00 m (Maximum berthing draft at zero tide, berths 03, 04 and 05). Source: Porto do Recife S.A., Autoridade Portuária, Portaria DIRPRE nº 030/2024: calado máximo de operação dos navios no Porto do Recife.

How big is the tide at Recife?

The average range is 1.58 m, from a mean high water of 2.08 m to a mean low water of 0.50 m above chart datum, across the 1,411 high and low waters the Navy forecasts for 2026 at Porto do Recife. Mean sea level is 1.28 m above chart datum.

Which months are wettest at Recife?

At the Recife (Curado) INMET station, 10 km away, June is the wettest month with 391 mm of rain and November the driest with 39 mm; the year totals 2,156 mm (normals 1991–2020). The mean daily maximum runs from 27.9 °C in July to 31.0 °C in February.

What can Seachios do for a ship at Recife?

Cargo Hold Cleaning · Tank Cleaning · Underwater Services · Anchor and Chain Services · General Ship Repair · Shipping Agency, coordinated by our operations hub in Santos, open 24/7.

09Sources

The documents behind the figures.

  1. [1]Porto do Recife S.A., Autoridade Portuária. Portaria DIRPRE nº 030/2024: calado máximo de operação dos navios no Porto do Recife. Recife, 15 de abril de 2024. Read Nov 26, 2026.
  2. [2]Porto do Recife S.A., Autoridade Portuária. Infraestrutura aquaviária. Read Nov 26, 2026.
  3. [3]Porto do Recife S.A., Autoridade Portuária. Cais, pátios, armazéns e silos. Read Nov 26, 2026.
  4. [4]Marinha do Brasil, Centro de Hidrografia da Marinha (DHN). Tábuas das Marés 2026: Porto do Recife (Estado de Pernambuco). 16 componentes, nível médio 1.28 m, carta 902. Read Nov 26, 2026.
  5. [5]Instituto Nacional de Meteorologia (INMET), via WMO and NOAA NCEI. WMO Climatological Standard Normals 1991–2020: Recife (Curado) (82900). NCEI accession 0253808, version 2.2. Read Nov 26, 2026.

Port information sheet

Everything on this page on one drawing sheet: the limits and their rules, the berths, the tide, the climate, the services, the questions and the sources.

SC-REQ-01Request for serviceOperations online · Santos --:--:-- BRT

ContactOperations hub · 24/7

Plan your next job in Brazil. Our operations hub replies 24/7.

Send the vessel, the port and the dates. We reply with a plan, a team and a timetable.

Response
30–60 min
Ports
14 · 04 Regions
Operations hub
Santos · 24/7

What to send

  1. 01The vessel and its IMO number
  2. 02The port, the berth or anchorage, and the dates
  3. 03The service, and what the work involves
  4. 04A plan from one of our tools, if you made one